Former GM Plant

Selective Demolition & Structural Dismantling

Selective Demolition & Structural Dismantling

Location: Sandusky, Ohio
Client: Avgeris & Franklin Partners

When the former GM/KBI manufacturing complex—built in 1946 and spanning more than 1.3 million square feet of buildings and 750,000 square feet of paved surfaces—needed to come down, the owner needed a partner who could handle heavy infrastructure, hazardous materials, and a long schedule without cutting corners. Melching stepped in with a fully self-performed approach to take the site from an aging industrial giant to a clean, buildable property.

What We Delivered

  • Full industrial decommissioning and complete structural demolition
  • Hybrid mechanical + deconstruction strategy for safety and control
  • Utility isolation, material separation, and engineered sequences
  • Environmental management of asbestos, lead, PCBs, and chromic acid
  • On-site concrete crushing with 120,000+ tons reused
  • Recycling and recovery of metals, including steel and copper
  • HAZWOPER-led containment zones and rapid PCB/oil-response capability

Equipment & Capabilities

  • High-reach excavators with tilt cabs
  • Heavy crawlers, shears, grapples
  • Full in-house maintenance and dust systems

Results

  • 26-month duration (2023–2025) with full safety compliance
  • Crew housing and self-performed labor saved major project costs
  • Entire site cleared, crushed, and graded to shovel-ready condition
  • Delivered under strict Compass compliance standards for documentation and safety

The Bottom Line:

This was demolition with no margin for error—vertical, heavy, and tightly controlled. Melching delivered it with precision, safety, and a spotless record.